Cordeel required an installation capable of processing aggregates in a single continuous line, from unloading at the jetty through to filling the silos. The system combines two intake methods: waterway unloading at the jetty on the one hand, and a dedicated truck unloading station for special aggregates on the other.
Deprez engineered a line bridging the entire distance between jetty and silos using a single 420-meter belt conveyor with an elevation gain of 22 meters. For structural support, the inclined section was mounted on concrete columns with a 22-meter span, ensuring maximum clearance and safety underneath. The extensive length and lift height, combined with the traveling tripper car above the silos, demanded an engineered drive system balanced against belt tension. Deprez leveraged its expertise and track record to implement an exceptional drive solution.
In addition to the intake line from the jetty, a dedicated truck unloading station was integrated specifically for the intake of special aggregates. This ties seamlessly into the long belt conveyor running toward the enclosed silos. To continuously monitor product flow, the system was equipped with a belt scale and a moisture meter. Safety was rigorously addressed as well: emergency pull-cord switches run along the entire length of the belt conveyor, enabling immediate shutdown from any point along the line.